Navigation section

Production Line Fixture Solution

Excellent Intelligence Creates a Better World

Production Line Fixture Solution

Production Line Fixture Solution


   Non-standard customization in the industry, quick replacement of the line body, short design cycle and fast delivery, which can meet the needs of customers for rapid sample and mass production.


● SAP system, can monitor the production process at any time, production Controllable;
● Strong precision machining capability, guaranteed delivery of fixtures;
   Proofing stage: delivery within 5 days for simple fixtures, 10-15 days for medium fixtures, and 20 days for complex fixtures.  
   Mass production stage: The weekly delivery capacity of test fixtures is more than 1920 sets (fixture assembly time is 20H/set)
● Rich experience in micro-needle testing: In terms of micro-needle testing of male and female connectors, the false detection rate is less than 2%, Advantages of long service life;
● The modular design of test automation loading and unloading equipment is compatible with different sizes of objects to be tested, reducing the cost of transformation caused by product upgrades and reducing labor costs.


治具车间.jpeg

产线治具研发能力(英文).jpg